Supabase project paused and the Lovable or Bolt app stopped working
Supabase pauses a Free project that gets too little database activity over a 7-day stretch, and a Lovable or Bolt app using that project then fails its data loads and sign-ins while the page shell can still return 200. Resume it in the Supabase Dashboard with Resume project: the data and configuration come back, and a paid Supabase plan is not paused for inactivity. If the app uses Lovable’s built-in database, that backend can pause on its own after about a week idle, and you wake it from the paused card in the editor.
Last updated Nov 25, 2026.
How to tell a paused project from the other failures
Write down the host that failed before you change auth settings or restore an old version of the app. A paused database and a bad redirect list look similar in the sign-in form and different in the network tab.
- The published page loads. Lists, profiles, and sign-in do not, for every account, including people who could sign in yesterday. In the browser network tab, the requests to the project’s
supabase.cohost fail. Supabase’s status-code guide says a paused project returns540and cannot process requests until the owner un-pauses it. Free projects are paused for inactivity, when the owner asks, or in rare cases for abuse. - Supabase emailed the project owner. The pausing guide describes two messages: a warning roughly one week before the pause, and a confirmation once the project has been paused.
- In the Supabase Dashboard the project is paused. Open that organization, select the project, and the action on it is Resume project.
- HTTP
402is a different stop. Supabase uses it when the fair-use policy or an overdue bill restricts the project, and you can still open the data in the dashboard. A paused project is540, and the dashboard shows the project as paused. - When the app uses Lovable’s built-in database, the pause shows up in Lovable, not as a project you resume in the Supabase Dashboard. Lovable shows a paused card in Database, Users, and Storage, and in Database settings, plus a notice in the project chat. The card says why it is paused. While it is paused the published app cannot read or write, sign anyone in, or serve files from storage. Export waits until you wake it, because those views show the card in place of the data. Edge functions stop too, so AI features, payments, and email that go through them stop with the database. Lovable says older React and Vite apps are the most affected. Apps created from May 13, 2026, which use TanStack Start, do not depend on edge functions.
- A redirect-URL miss usually fails on one address. Preview login works, the published URL or custom domain does not, and the Supabase project stays active. Those checks are in My Lovable app stopped working and Bolt app sign-up works in preview but breaks after deploy. A missing production env var sends the request to the wrong host, or to no host, so you will not see
540on the project you think you are using. Row-level security fails one query with a permission error while the project is running.
Resume it
Resume the Supabase project
This is the path for a Bolt app, or a Lovable app, that calls a Supabase project you connected. Supabase’s pausing guide is the source for the clicks.
- Open the Supabase Dashboard. Select the organization, then the paused project.
- Click Resume project and confirm.
- Supabase restores the previous state, including data and configuration. The pausing guide does not say how many minutes Resume takes. Wait until the project is running before you retest the app.
- One-click restore from Studio is available for 1 year after the pause. The limit is there because backups are kept for a limited time, and platform changes may not be backward compatible with older backups. Unlike an active project, those static backups cannot be updated to match later platform changes.
After that year, Supabase’s upgrading guide says you can download the project’s backup file and Storage objects from the project dashboard, then restore them to a new Supabase project or locally. The same guide says that upgrading to a paid plan while the project is paused turns expired one-click restore back on, and that the restore can still fail because the backup was taken outside the compatibility window. Contact Supabase support if that restore fails. It also says a restored Free project moves to the latest Postgres minor version, so a project that comes back can still behave differently from the week it paused. Retest the published app after the dashboard says it is up.
Leave the project in place while you decide. Deleting it permanently removes the data, including backups Supabase stored for that project. That is a different action from Resume project.
Wake a Lovable database
Lovable’s built-in database, user accounts, and file storage run together. Pausing the database also pauses sign-in, storage, and edge functions. Lovable pauses that backend automatically after about 7 days without activity. Data stays. Storage usage continues while it is paused, because the files are still there. The steps below are from Lovable’s pause and resume guide.
- Open the project. If Lovable paused it for inactivity, opening it in the editor wakes it. Waking takes a few minutes. Traffic to the published app does not resume a paused project, and waiting does not either.
- If you paused it yourself, use the paused card in Database, Users, or Storage and click Wake up. The same card is where you go for every pause that opening the editor does not clear. You can pause it yourself under More → Database → Manage → Settings → Pause database. Lovable says to do that when scheduled jobs or other background activity would otherwise keep the project from auto-pausing.
- If the workspace is out of credits, the card says Top up. Add credits, open the project again, and click Wake up. A top-up does not wake the backend by itself.
- If a credit limit is still triggered, the card says Manage limits. Raise or remove the limit under Workspace settings → Usage limits & alerts, then open the project again and click Wake up.
- If Lovable unpublished the app for inactivity, click Wake up, then publish again. Lovable’s guide says a Free workspace may unpublish a published app that has had no visits and no workspace-owner login for 12 months or more, and that the backend is paused at the same time.
- If Lovable paused the project for excessive usage, the card has no action. Adding credits does not resume it. Contact Lovable support and include the project URL.
Wake the project before you export or change database settings. The paused card replaces the data views, so an export from those screens has nothing to read until the project is awake. Do not click Remove unless you mean to delete the database. Remove deletes the database, its backups, user accounts, and the files in storage, and Lovable says that cannot be undone. Export the database and download files first if you do intend to remove it.
Sign in on the published URL
- Use a private window on the URL customers use. An old session in the editor can hide a database that is still paused.
- Sign in, then open a screen that has to read a row. A homepage that paints a shell from the host is a different test.
- Repeat on the custom domain if you have one. The Lovable or Bolt preview is not the published app.
Keep the next week from pausing it
Real database activity
Supabase pauses Free projects that show low activity over a 7-day period, to save server resources. A project is inactive when it does not receive enough user database activity over the past week. Too few user queries is the clearest case. Supabase says you can be using the project and still have too little activity to stay off the pause list, and that a few user requests to the database each day over the previous week is typically enough.
The warning email is the moment to act. Supabase says you can prevent that pause by opening the project in the Dashboard, which generates activity, or by making enough API calls to the project or sending requests through the connected app. A fetch of the Lovable or Bolt URL counts only when that request itself runs a database query. A static shell on the app host, or a check that stops at the HTTP status, does not.
A scheduled query is a workaround
A cron on a machine you control, or a GitHub Action, can send that database activity on a schedule. Two shapes match the pausing guide. Run a small query on the database connection from the project’s Connect panel, such as select 1. Or call the project API in a way that hits the database, such as a read of one row from a table the API is already allowed to read. Do it a few times a day. Put the connection string or the key in the scheduler’s secret store.
Supabase does not publish the number of queries that counts as enough. The guide’s own caveat is that some activity still is not enough to avoid the pause. Treat the job as a workaround, not a guarantee. If the job itself starts failing, the project may already be paused, or the password in the secret may have changed. A query that succeeds does not tell you the login form still works, or that the app is pointed at this project.
Lovable’s pause is a separate rule. The Lovable guide says the built-in backend pauses after about 7 days without activity, and that automatic pausing does not apply when the project has scheduled jobs or other background activity. It does not publish a query count. It does say that traffic to the published app does not resume a project that is already paused.
Move the Supabase project to Pro
The pausing guide’s way to leave automatic pausing is an upgrade to the Pro plan from Billing Settings. Projects on a paid plan are not subject to automatic pausing for inactivity. Supabase’s production checklist says upgrading to Pro guarantees the project will not be paused for inactivity. That upgrade applies to the Supabase project. A Lovable built-in database is paused by Lovable. A Supabase Pro subscription on a project the app does not use will not wake Lovable’s backend.
Export a copy off the platform
Take the copy while the project is running. Resume it first if it is already paused. The dump needs a database connection, and a paused project is not serving requests. Free projects do not get downloadable daily backups. Supabase’s backup guide says to export them regularly with the Supabase CLI db dump command, which runs pg_dump, and to keep the files off-site. Pro projects can open the last 7 days of daily backups under Database → Backups. Team projects get 14 days. Enterprise projects get up to 30 days.
Supabase’s backup-and-restore guide asks for the CLI, Docker, and the connection string from the project’s Connect panel. Use the direct connection, or the session pooler connection if your network has no IPv6 and you do not have the IPv4 add-on. The database password is the one in that string. Resetting it in Database Settings changes the password for anything that connects with it. The anon key in the Lovable or Bolt app is a different secret. Then run the three dumps from that guide, with your connection string in place of the placeholder:
supabase db dump --remote="[CONNECTION_STRING]" -f roles.sql --role-only supabase db dump --remote="[CONNECTION_STRING]" -f schema.sql supabase db dump --remote="[CONNECTION_STRING]" -f data.sql --use-copy --data-only -x "storage.buckets_vectors" -x "storage.vector_indexes"
Read the limits before you treat those files as a full copy. The CLI reference says db dump excludes managed schemas, including auth and storage, and that the default dump contains no table data and no custom roles. The data file above is the one that has rows. Database backups store metadata for Storage objects, not the files themselves. Download storage files separately if you need them. Do not commit the dump to a public repository. Supabase’s GitHub Actions backup guide says the data file is plain-text SQL and tells you never to back data up to a public repo. GitHub-hosted runners need the session pooler string, because the direct host is IPv6 unless the project has the IPv4 add-on.
How to catch it next time
Three different jobs get mixed together here: noticing that the homepage answers, keeping the database from going idle, and checking that login or a data screen still works. They are different tools.
- A generic uptime pinger. It fetches a URL and tells you the status code. That is the right tool when the host is down or the homepage returns 500. The Lovable or Bolt page can return 200 for the whole time the Supabase project is paused, because the shell is served by the app host and the data calls go to
supabase.coand get540. A ping of the homepage does not sign anyone in, does not load a row, and is not the database activity Supabase counts. - A keep-alive script. A cron or GitHub Action that runs a real query, or an API call that hits the database, a few times a day. This is aimed at the pause rule. Supabase says that kind of activity is typically what keeps a Free project up, and also that some activity is still not enough. A green query means that one query ran. It stays green when the login button is gone, when the app talks to a different project, and when sign-in fails for a redirect-URL reason. It does not email you that a customer could not sign in.
- BreakAlarm. You describe login or a data screen once: open this page, expect this text, click, fill. It re-walks those steps on a schedule and, on Starter and Pro, after a deploy hook, then emails a screenshot and a paste-ready fix prompt when a check fails, and emails again when the check recovers. Free checks one app every 24 hours. Starter is three apps, every hour, with a deploy hook. Pro is ten apps, every 15 minutes, with the hook and a Stripe lockout check. A green result only means the steps you wrote passed. Point the flow at login or at a page that must show a row. A check that only fetches the homepage is the same blind spot as the pinger, and BreakAlarm can be set up that way. It does not resume a paused project, and it is not a keep-alive. One walk a day is not the few database requests a day Supabase describes, and a flow that fails because the project is already paused does not wake it. Lovable says published traffic does not resume a paused database.
The limits are the ones on the pricing section. What is BreakAlarm is the same description, including who it is for. The same class of “the page loads and the account flow does not” on Lovable is in My Lovable app stopped working, on Bolt in Bolt app sign-up works in preview but breaks after deploy, on Replit in Replit app works in preview but breaks after publish, and for live payments in Stripe checkout works in test mode but fails after going live. Other write-ups are on Guides.
The homepage runs one check of a public URL you are allowed to test. It opens that page, reports the HTTP status, and shows a screenshot when the page renders. It does not sign in, it does not start the schedule, and a 200 can still pass while the database is paused.
FAQ
Why did my Lovable or Bolt app suddenly stop loading data and signing people in?
The usual cause on a Supabase Free project is a pause after a 7-day stretch with too little database activity. The app host can still serve the page. Calls to that project’s API, including auth and row reads, get HTTP 540 until the owner resumes the project. Supabase emails the project owner a warning about a week before, then a confirmation once it is paused. If the app uses Lovable’s built-in database, Lovable can pause that backend after about 7 days without activity. The editor then shows a paused card in place of Database, Users, and Storage, and the published app cannot read, write, sign anyone in, or serve storage files.
Does a paused Supabase project delete my data?
Pausing keeps the data. Supabase’s pausing guide says Resume project puts the project back to its previous state, including data and configuration. One-click restore from the dashboard is available for 1 year after the pause. After that year, the upgrading guide says you download the project’s backup file and Storage objects from the dashboard and restore them to a new project or locally. Upgrading to a paid plan while the project is paused turns the expired one-click option back on, and that restore can still fail because the backup may be outside the compatibility window. Deleting the project is a different action: Supabase permanently removes the data, including backups stored for that project.
How do I resume a paused Supabase project, and how long does it take?
Open the Supabase Dashboard, select the organization, then the paused project, and click Resume project and confirm. Supabase does not publish how many minutes that takes. Wait until the project is running, then sign in on the published URL and open a screen that reads a row. Restoring a paused Free project also moves it to the latest Postgres minor version, so retest the app after the dashboard says it is back.
Will an uptime ping of the homepage keep the Free project from pausing?
A homepage ping tells you the app URL returned a status code. Supabase pauses on user database activity: user queries, or API calls and app requests that reach the database. The pausing guide says a few of those requests each day over the previous week is typically enough, and that some use of the project is still not enough. Fetching the Lovable or Bolt page does not, by itself, run a query. A keep-alive has to hit the database, and it is still a workaround, not a guarantee. Upgrading that Supabase project to Pro is the option the pausing guide gives for leaving automatic pausing.
Lovable shows a paused card and I cannot export. Is that the same as a Supabase pause?
It is Lovable’s pause of the built-in database, which also pauses sign-in, storage, and edge functions. The Database, Users, and Storage views show a paused card instead of your data, so wake the project before you export or change settings. Opening the project wakes a pause that happened for inactivity. If you paused it, or credits or a limit paused it, use the action on the card and then Wake up. A top-up does not wake the backend by itself. Waking takes a few minutes, and traffic to the published app does not resume it. A Supabase project you connected is resumed with Resume project in the Supabase Dashboard. The network tab shows which host the app is calling.
Will BreakAlarm wake the database, or catch that sign-in and data loads failed?
BreakAlarm does not resume a paused project and it is not a keep-alive. A flow check re-walks the steps you wrote, such as open the login page, fill it, and expect the text that only appears after a row loads. That fails when the database is paused and the shell of the site still returns 200. Free checks one app every 24 hours. Starter is three apps, every hour, with a deploy hook. Pro is ten apps, every 15 minutes, with the hook and a Stripe lockout check. A green result only means those steps passed. The one-off check on the homepage opens a public URL and reports how the page responded. A 200 there can still pass while Supabase is paused.
References
- Supabase: Project pausing. Free projects and a 7-day activity window, the warning and confirmation emails, Resume project, the 1-year restore window, and Pro as the way out of automatic pausing.
- Supabase: Upgrading. What you can download after the 1-year window, restoring a paused Free project onto the latest minor version, and one-click restore after a paid upgrade.
- Supabase: HTTP status codes.
540means the project is paused.402is a service restriction, and the dashboard can still open the data. - Supabase: Production checklist. Free projects can be paused for low activity in a 7-day period. Upgrade to Pro so inactivity will not pause the project. Free plan backups are not available for download.
- Supabase: Database backups. Daily backups on Pro, Team, and Enterprise, and the recommendation that Free projects export with
db dumpand keep off-site copies. - Supabase: Backup and restore using the CLI. Docker, the Connect connection string, and the roles, schema, and data dumps.
- Supabase CLI: db dump. The command runs
pg_dump, excludes managed schemas including auth and storage, and the default dump has no data. - Supabase: Automated backups using GitHub Actions. Keep the data file out of a public repository, and use the session pooler string on GitHub-hosted runners.
- Lovable: Pause, resume, or remove your project’s database. The paused card, waking a project, the about-7-days idle pause, and what Remove deletes.
Supabase, Lovable, Bolt, Replit, Stripe, and GitHub are trademarks of their owners. BreakAlarm is not affiliated with them.